Showing posts with label roman tub. Show all posts
Showing posts with label roman tub. Show all posts

Monday, February 15, 2010

As The Remodel Proceeds~~~~


Here we are starting week 2. Yes, the remodel continues of the master bathroom. I find myself very anxious to get everything finished, but I know from many a remodel in my career and lifetime, that it does take time. Every little detail takes lots of measuring, planning and patience. Then, you wait for inspectors to approve before you can move to the next step. But through it all, the process is rewarding. I have mentioned many times here, when I do a redesign, I see it finished before I begin. That's just how I work out the plan for change. Then I draw from my design board and my vision to the end. It is my formula to reach the final look. And, final look I am ready for. LOL! We lost 2 days last week because of our snow storm but full steam ahead this week to completion. We are trying for the end of the week with the walls and all the tiled surfaces. Then the plumber will finish his details before the glass man comes with the shower doors.

Here are a few pics of the progress so far. The top and first picture is the design board I made for the redesign. Sometimes changes have to be made here and some details addressed, but I am fairly close to this one. I did however change the tile to travertine from rialto.
Today was a huge accomplishment as the shower walls were installed in the shower area and also around the jacuzzi tub. Our tile guy also got lots of tiles cut and measured. He is a perfectionist and everything has to line up perfect before he proceeds. I am so glad he works this way, as any mistakes in positioning will show. Tiles have to be perfect as they run up the tub skirt to look right. This is when you find out how straight your walls are. Then, more adjustments have to be made so those crooked walls don't show. LOL
It takes a talented tile guy to do it right. I am thankful for this, because I tell ya, I have never seen a perfectly square room.

Special drywall for showers is used to be water tight and mildew resistant. The floor of the shower is called the "shower pan" Here is a special type that will never leak, crack, or mildew. Over this base goes the tile. This step has to be thoroughly inspected by the city before you can continue with tile.


The tile is a travertine in neutrals shades. It is slightly lighter then the pics show. The grout will be a type that is permanetly sealed to never discolor or need to be sealed again. Got to love that. No scrubbing grout~~ yeah!!!



I know these are not very pretty pics at the moment, but I hope you are enjoying the progress along the way and the steps it is taking to completion. Remember it always looks bad before it looks good. My old saying about everything I paint!!
So till next time, I will leave you with some prettier pics of my Valentine roses.



As a side note, during our big event of a snow storm last week, we had 12.5 inches of snow in Dallas and the surrounding areas. Never that much snow in 32 years. We may not see it again for that long too. Today it is gone, all melted away with the sunshine~~ although still cold temps linger. Spring, hurry up, we miss you!!
Here is Miss Beazy pooped after her run in the snow.

Till next time, have a wonderful week.
Blessings always, Celestina Marie

Continue Reading
27 comments
Share:

Monday, February 8, 2010

Bathroom Demo Begins~~


As the redesign continues, today was the day to demo the master bath. Only the shower, doors, floor and tub surround are the focus this day. All went well, as out with the old took place. It looks awful right now, but like any painting I create, "it always looks bad, before it looks good!!"

So as the demo took place, I took my cozy position in the studio and painted away. Yes, it is so great to be back in the studio and creating to my hearts content. I have many new items on the way to my etsy shoppe. While the bathroom design takes place, before I can do my finishing touch, I will swing my paint brush in many directions.

Tomorrow starts the tile work and I am excited to watch the transformation, but first, I took a few pics of the weekend preparations and today's demo.

This picture shows the carpet pulled out!

Removing the shower walls and doors. What a mess!


My BG's talents serve him well as he put in the Roman Tub fixtures to coordinate with the sinks that he installed last week.



It has been a long day, but a lot was accomplished. The workman arrive early tomorrow to continue. Each day we get closer to the final design. Then the fun begins when I can pull the room together with the touches that make a house a home.

Thank you for stopping by to share in this design journey with me. To see the master bedroom finished, you can view the post below when my break was over.

More pics on the way as the work progresses. And, I invite you to stop by my Etsy shoppe to view more hand painted treasures on the way!
See you again soon!
Hugs, Celestina Marie

Continue Reading
15 comments
Share: